RATE Group | PR: 4NEW – Two Operational Power Plants Secured with Launch Plan to Initiate Onsite Crypto Mining Farm
24741
post-template-default,single,single-post,postid-24741,single-format-standard,ajax_fade,page_not_loaded,,qode_grid_1300,side_area_uncovered_from_content,footer_responsive_adv,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-13.3,qode-theme-bridge,wpb-js-composer js-comp-ver-7.9,vc_responsive
 

PR: 4NEW – Two Operational Power Plants Secured with Launch Plan to Initiate Onsite Crypto Mining Farm

PR: 4NEW – Two Operational Power Plants Secured with Launch Plan to Initiate Onsite Crypto Mining Farm

[ad_1]

4NEW - Two Operational Power Plants Secured with Launch Plan to Initiate Onsite Crypto Mining Farm

This is a paid press release, which contains forward looking statements, and should be treated as advertising or promotional material. Bitcoin.com does not endorse nor support this product/service. Bitcoin.com is not responsible for or liable for any content, accuracy or quality within the press release.

London, UK. Today, 4NEW announced that they have secured two operational Waste to Energy power plants that produce over 10 megawatts of electricity per hour in the United Kingdom. The power plants, located in Middlesborough and Hartlepool, utilize the Anaerobic Digestion technology to convert regular household waste and feedstock into electricity that is currently sold to the UK national grid.

4NEW’s securing of the two power plants is positioned to redefine the crypto landscape by placing a permanent footprint for the community that will deliver for decades to come. In Q3 of this year, 4New will install onsite cryptocurrency mining farm that will be powered by…

[ad_2]

Article Source