RATE Group | Ethereum’s Muir Glacier will be activated on 01 January
73013
wp-singular,post-template-default,single,single-post,postid-73013,single-format-standard,wp-theme-bridge,wp-child-theme-bridge-child,ajax_fade,page_not_loaded,,qode_grid_1300,side_area_uncovered_from_content,footer_responsive_adv,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-13.3,qode-theme-bridge,wpb-js-composer js-comp-ver-7.9,vc_responsive
 

Ethereum’s Muir Glacier will be activated on 01 January

Ethereum’s Muir Glacier will be activated on 01 January

[ad_1]

  • Ethereum will conduct its next hard fork, Muir Glacier, on schedule at block 9,200,000.
  • Activation is expected to occur on January 1, although variable block times may still affect the exact timing.

The Ethereum mainnet is scheduled to upgrade to Muir Glacier at Block 9,200,000. The hard fork is expected to be activated on Wednesday, January 1, 2020. The exact date may still change due to variable block times. Both the Ethereum Foundation and various developers from the Ethereum ecosystem have requested the node operators to update their software before 1 January 2020.

Node operators must update to Geth v1.9.9, Parity v2.5.12-stable, Besu v1.3.7, Nethermind v1.2.6, ethereumJS v4.1.2 or Aleth v1.8.0. Harmony (ethereumJ) will not support the fork and is…

[ad_2]

Source link